General Plan Final EIR (Certified May 25, 2004)

volume II: Technical appendices

  • Planning Links

  •  

    Planning Home Page

    General Plan EIR Main Page

    General Plan EIR Volume 1

    General Plan EIR Volume 2

    General Plan EIR Volume 3

     
     
     
     
     

      

     
     
     
     
     
     
     
     
     
     
  • Table of Contents
  • Chapters Chapter Title
    Cover and Table of Contents
    A Notice of Preparation and Initial Study
    B Comments on Notice of Preparation and Initial Study
    C The Anaheim Resort Expansion Area Updated and Modified Mitigation Monitoring Program No.0085a
    D The Platinum Triangle Updated and Modified Mitigation Monitoring Program No.106
    E The Anaheim Resort Specific Plan No.92-2, Amendment No.5 - Summary of Proposed Amendments to the Specific Plan
    F Air Quality Data
    G Noise Data
    H Traffic Study Data
    I Geotechnical Study
    J Water System Baseline Conditions
    K Sewer System Baseline Conditions
    L Fire Defense Analysis
    M General Plan Update - Water, Wastewater, and Drainage Report
    N Drainage Report: Baseline Conditions, Opportunities and Constraints
       
     
  • Contact Info
  • City of Anaheim
    Planning Department  200 South Anaheim Blvd.
    Anaheim, CA 92805
    1st Floor City Hall East
    (714) 765-5139